Showing posts with label SITP. Show all posts
Showing posts with label SITP. Show all posts

Tuesday, October 27, 2009

more SITP blocks and a litte side tracked!

First, I am working on my SITP blocks...slow but sure. I'm loving it. A little unusual for me since they aren't bright colors. But I am loving all the scrappy pieces coming together.
Last week someone was renting Khloe, andI like to stick close by in case they need me. I would rather have been sewing, but thought I should tackle cleaning my 'supply closet' since I could only open the door. I couldn't even step into it! Mona............where are you? LOL I should have taken a 'before' picture. I had a big box on the floor full of upholstery samples (mostly microfiber stuff and velour type stuff). There were all kinds of wonderful samples, but most not big enough to make anything. I pulled the box out to pitch it and then picked one up. Hey--I could get a 5 1/2" square out of them, if I didn't mind a little glued on paper on the back stating the type of upholstery fabric it was and color. (picture shown is AFTER I cut the samples off...I didn't think to take a picture before because I was really supposed to be CLEANING and not CREATING!)
So, I spent the next 3 hours cutting all the pieces off the header and cutting them into squares. I thought they would have made a beautiful jacket, although it would have been a bit heavy. Then I thought...what about a color block purse? So, leaving the piles of stuff sitting out.......I headed the sewing machine and sewed (2) 9 patch pieces. They will be the front and back of the purse. Gotta think about a lining and handles.......stay tuned!

Oh, guess what else I dug up? My Dear Jane project...so sadly neglected. I really need to get it out and finish it! Some poor soul finding it when I've passed away probably wouldn't want to finish it. It's my 'Lifetime Acheivement' quilt because if I finish it in MY lifetime, it will certainly be an achievement! So, I did another block to get me back in the mood.

Tuesday, October 13, 2009

SITP progress and some charity finishes

I'm plugging away on my SITP blocks. I seem to be doing them out of order with the rest of the group. Oh well, as long as I'm working on them. I got all my light stars with my dark backgrounds cut out (for the 28 small stars--of which 8 of them will be inside a larger star) and only 3 done, 25 more to go in the variation. And then to repeat it all in dark stars/light backgrounds! I'm afraid I'm going to run out of fabric--and am thinking that maybe I better start introducing more fabrics now so they won't stand out later? I used 40 FQ's so far with just a tiny bit left.

I've been training more people how to use Khloe (my new--well used to be new) long arm machine. I put quilt tops on there they can practice on and then I bind them and send them off to charity.
It always inspires me to get another one of my tops done. I chose this one because it is for fall and we are right smack dab in the middle of it--although it feels a lot closer to winter! BRRRR! I've been freezing for 2 weeks now. What's going to happen in January? This quilt was made from leftovers from another quilt made with my friend Marilyn. I had to come up with a simple class for beginners and this was it. It's the size it is because that's what I had left of the strips. I've noticed that a lot of my design decisions are based on what I have left or what's sitting close by! LOL